Requirement review
Your 2D or 3D drawings, a prototype or a functional sample, read against the process route before anything is quoted.
Files: PDF, DWG, DXF · STEP, IGES, X_T, SLDPRT, PRT, STL · BOM in Excel or CSV
One drawing enters, a packed carton leaves. Each stage needs the right information before it can start, so the quotation, the tool and the mass run all rest on one drawing.
Steps 01–03
Your 2D or 3D drawings, a prototype or a functional sample, read against the process route before anything is quoted.
Files: PDF, DWG, DXF · STEP, IGES, X_T, SLDPRT, PRT, STL · BOM in Excel or CSV
Grade, temper and thickness recommended against the loads, the environment and the finish the part has to take.
Copper, steel, stainless steel and aluminium, grade by grade — the full list is further down
A project-based breakdown you can argue with: material, tooling, stamping or molding, finishing and packing, line by line.
Volume: sampling to PPAP to mass run, with the tooling cost separated
Steps 04–06
Design for manufacturability review to take cost out while the change is still free: radii, relief, bend sequence, wall thickness.
Same geometry on the validation batch as on the mass run
3D mold structures and stamping die layouts drawn in professional software, with the strip layout and die sequence fixed before steel is cut.
Layout shared for approval before fabrication
High-hardness tools built to tolerance for long production runs, with ownership and maintenance agreed before the first cut.
Ownership: see the tooling terms at the end of this section
Steps 07–09
We stock the grade and the mill certificate behind it, or we process material you supply and consign.
Grade, temper and thickness confirmed against the drawing
High-speed stamping for metal parts, injection molding for plastic ones, or both in a single metal-plastic part.
Progressive, compound or single-hit, chosen by volume
Drilling, tapping, surface plating or painting, run to the finish callouts on your drawing rather than to a house default.
Finish type and thickness, colour, gloss, brushing grade or anodizing
Steps 10–12
Automated and semi-automated lines run to the agreed volume and the agreed date, not to a best effort.
Capacity planned from the annual estimate plus a rolling forecast
Checks at each stage rather than only at the end, with the special characteristics on your drawing tracked to their Cpk.
Inspection points agreed with the drawing and the PPAP
100% inspection before packing, labels per your requirement, and cartons rated for the shipping route the parts actually take.
Quantity, packing method and rust prevention per your note
Six things make a quotation accurate and a mass run repeatable. Without them the first article becomes the place where the questions get asked.
A STEP model together with a 2D drawing that carries the tolerances gives the most accurate quotation and the most useful engineering review.
Drawing not finished yet? Send the STEP model and mark only the tolerances you actually care about — an engineering review can start from that. Anything sent is covered by the NDA on request, and drawings are not passed to a third party.
Four material groups cover most of what we run. The thickness is what the process holds for that group; the finish is what can be applied to it.
| Material | Grades | Thickness | Finishes |
|---|---|---|---|
| Copper | T2, C1100, C2680, beryllium copper | 0.1–3.0 mm | Tin, silver or nickel plating; polishing; passivation |
| Steel | SPCC, SPHC, 08F, Q235, B340LA | 0.2–6.0 mm | Zinc (electro or hot-dip), Dacromet / Geomet, painting, black oxide |
| Stainless steel | SUS301, SUS304, SUS316, SUS430 | 0.1–5.0 mm | Polishing, brushing, passivation, electropolishing, PVD |
| Aluminium | AL5052, AL6061, AL6063, AL1100 | 0.3–5.0 mm | Anodizing (natural, black, colour), painting, brushing, polishing |
Stock status per grade and the thickness actually achievable on your part are confirmed at engineering review — the range above is the window, not a promise for every drawing.
The commercial questions that decide whether a project starts: how large the first order is, how the year is planned, and who owns the tool afterwards.